Sabine Moukhaiber

Help Rebuild Sabine's apartment in Beirut

Address: Ashrafieh

Sabine Moukhaiber is a single mom of two. She works as an architect and lives in the heart of Beirut. Her apartment sustained a lot of damage because of the august 4th Blast. She is counting on your donations to be able to go back to living a normal life in a normal home. All the updates on the rebuild will be uploaded for you to keep track of our latest works on her home. Thank you for helping us help Sabine.

http://evenergycy.com/WPBeeatoona/wp-content/uploads/2019/09/beeatoona-signature-team-179x50.png

Total Aluminum & Glass Works 4944$
- Apply supply and modify aluminium window with accessories & glass 16.2sqm 1782$
- Apply supply and modify aluminium slot with accessories & glass 27.6sqm 3162$
- Wired 6mm Glass 1 50$
Final Amount: 4994$

Latest News

  • Maintenance
    September 4, 2020 - Maintenance for french aok veneer wood finish; including replacing broken and missing accessories with necessaary materials as per the specifications -Guest wc door- No. 1 $350 $350 b. Maintenance for wood doors in Maid room/hall beteween bedrooms, closet shutters in Sara bedroom/Hall between bedrooms and fixing access traps in wcs/Hall between bedrooms l.s. 1 $400 $400 c. Fixing back TV stand; with supply & Install wood drawer white glossy painted; including all necessary materials and accessories -Salon- l.s. 1 $300 $300 d. Fixing broken wood elements in bibliotheque with radiator cover; including painting and all necessary accessories and materials l.s. 1 $450 $450 e. Maintenance for all lamaica wood closets shutters; with aluminum shutters and black glass; including all necessary materials and accessories -Kitchenl
  •  
    Civil Works
    September 4, 2020 - Execution Requirements Allow for the following requirements governing execution of the works; include all requirements as per the specifications a. Progress cleaning all period of works b. Protection for existing finishing (cartonal ,plywood & nylon ) c. Carrying of wrapped stuff/elements

Civil Works

Civil Works

Execution Requirements
Allow for the following requirements governing execution of the works include all requirements as per the specifications:

  1. Progress cleaning all period of works
  2. Protection for existing finishing (cartonal ,plywood & nylon)
  3. Carrying of wrapped stuff/elements









Joseph Haddad

Beeatoona and AUB collaborate to spread awareness on the dangers of E-waste

AUB, Lebanon

Wednesday October 20, 2010